0%
INDUSTRIAL FILTRATION · 3D
PHOENIX PRIME
SOLUTION

Environmental monitoring

Continuous monitoring of emissions, ambient air quality, water and effluent with data transmission to the regulator.

CEMSAQMSSamplingGas analysersDust monitorsData acquisitionWeather stationsWater and effluent monitoring
WHERE IT IS USED

Sites

Plants with regulated emissionsCement, metallurgy, powerWaste incineration plantsIndustrial sites and sanitary buffer zonesSites required to report onlineChemicals and fertilisers: HCl, VOCsMining and beneficiation: pits, waste dumps
WHAT THE SOLUTION INCLUDES

From the probe to the state platform

01 / 08StackCEMS — continuous emission monitoring

Continuous emission monitoring in the stack with data transmitted to the regulator. A rise in emissions is the first sign of a torn bag.

  • Components: SO₂, NOₓ, CO, CO₂, O₂, PM, HCl
  • Standards: EN 14181, USEPA
  • Averaging 20 min / 1 h / 24 h
  • Integration: Ecoonline.uz (Uzbekistan), ASM (Kazakhstan)
  • Calibration: QAL2 / AST annually
MATERIALS AND VERSIONS

For aggressive media and outdoor sites

  • Probe: SS316L, titanium for aggressive media
  • Heated PTFE line
  • Sample conditioning cabinet with a chiller
  • Analysers: NDIR, UV, FID, laser dust monitor
  • Modbus RTU / TCP, OPC UA protocols
  • IP54–IP65 cabinet, climate control
  • Met mast: wind, temperature, humidity
  • Cabin with climate control (AQMS)
TYPICAL SPECIFICATION

CEMS technical data

ParameterValue
ComponentsSO₂, NOₓ, CO, CO₂, O₂, PM, HCl
Accuracy≤ ±1 – 2% FS
Response time≤ 60 s
Frequencycontinuous; averaged over 20 min / 1 h / 24 h
Operating temperature0–50 °C (option −20…50)
Power supply220 V AC / 24 V DC
ProtectionIP54 / IP65
InterfacesEthernet, Modbus, 4G, OPC or Profibus
Integrationwith DCS, SCADA or PLC
State platformsEcoonline.uz (Uzbekistan), ASM system (Kazakhstan)
StandardsUSEPA 40 CFR 60/75, EN 14181, ISO 14956, QAL1/2/3
Calibrationannual, QAL2 / AST
ARCHITECTURE

CEMS configuration: from the probe to the state system

Data is available to both the operator and external systems: local HMI, archive, trends and alarm limits; industrial protocols and API/gateway; integration with a state or corporate platform once its technical interface is confirmed.

  1. 01Sampling probe

    Representative sampling from the duct; back-purge and inlet filter.

  2. 02Heated line

    Transports the sample to the analyser above dew point (120–180 °C).

  3. 03Sample conditioning

    Gas cooler (Peltier) and 2 – 5 µm filter; a spare filter cuts downtime.

  4. 04Analyser and data processing

    Gas analysers, dust monitor, PLC cabinet, archive and reports.

  5. 05Data transfer

    Fibre / 4G / Ethernet; link to Ecoonline.uz or ASM with redundancy.

NATIONAL STANDARD

Oʻz MSt 195:2024: thresholds above which a CEMS station is mandatory, g/s

The standard defines at what emission levels a station is mandatory and what requirements it must meet. In force since 28 August 2024.

PollutantThreshold, g/s
Particulates0.833
Sulphur dioxide (SO₂)8.333
Nitrogen oxides (NOx)8.333
Carbon monoxide (combustion completeness indicator)1.388
Carbon monoxide (other cases)27.777
Hydrogen fluoride (HF)0.083
Hydrogen chloride (HCl)0.417
Hydrogen sulphide (H₂S)0.083
Ammonia (NH₃)0.417

A station is also mandatory if any substance exceeds 60% of the total emission of all stationary sources. We determine which station your industry needs free of charge by comparing your emissions with the thresholds of the standard.

TECHNICAL REQUIREMENTS

To Oʻz MSt 195:2024 (CEMS) and Oʻz MSt 194:2024 (AQMS)

Oʻz MSt 194:2024 has been in force since 28 August 2024 and is mandatory for impact categories I and II; developed in line with BS EN 14181, with data sent to the Unified geoinformation database in real time. Our AQMS stations are built to these requirements.

  • Protection rating: CEMS — at least IP54, AQMS — at least IP55
  • Response time (T90) — no more than 45 seconds
  • Measurement frequency: CEMS — at least once a minute, AQMS — at least once every 180 seconds
  • MTBF: CEMS — at least 24,000 hours, AQMS — at least 15,000 hours (P=0.95)
  • Zero and span drift — ±2% of full scale per week
  • Backup power — at least 4 hours
  • Permitted annual downtime for maintenance — no more than 28 calendar days (CEMS)
  • Data archive — at least 12 months (AQMS); transmission — 4G and GPRS, Wi-Fi for local setup
  • AQMS operating range −40 °C to +60 °C, station weight 5–50 kg
  • Service life: CEMS — at least 10 years, AQMS — at least 5 years; sensors — at least 2 years
  • AQMS monitors: NO₂, SO₂, NH₃, CO, O₃, H₂S; PM2.5, PM10, total dust; met block
WHERE IT WORKS

What monitoring delivers

  • Proof of regulatory compliance
  • Early detection of filter failure from rising emissions
  • Automatic reporting without manual data collection
  • Protection from fines during inspections
WHERE IT DOES NOT FIT

What not to expect

  • It does not replace cleaning — it only measures
  • Requires regular calibration and span gases
  • Will not work without stable power and a data link
  • The sampling point must meet the requirements of the standard
FAQ

Monitoring questions

Can CEMS replace gas cleaning?

No — the station only measures. But it gives early diagnostics: a rise in emissions is the first sign of a torn bag, and a jump in the dust monitor reading means a bag has failed. The dust monitor is fitted after the filter, before the ID fan.

Why is sampling the weakest link?

80% of CEMS failures are the probe, the line and the sample filter. A line below dew point loses SO₂ and HCl, so it is heated to 120–180 °C. Back-purging extends the service interval and a spare filter cuts downtime.

How is the analyser range chosen?

From the actual emissions, not «with margin»: ranges from 0–50 to 0–5,000 mg/Nm³, accuracy ±2% of full scale, response under 60 s. A stock of calibration gases is required; calibration uses span gases and auto-zero.

What happens to the data when the link drops?

Without a stable link the regulator does not accept the data, so the link is duplicated and a local archive (at least 3 years) keeps the measurements during the outage. The cabinet has a UPS and lightning protection.

Why does AQMS need a weather station?

Without met data the AQMS results cannot be tied to an emission source. The mast height is set by the method statement (2 / 10 m) and sensors are heated against icing. The station shows your site’s own contribution and works in tandem with CEMS.

How often is calibration required?

Annually, under the QAL2 / AST procedures. The standard allows zero and span drift of no more than ±2% of full scale per week, so regular span and calibration gases are needed.

What data is needed for a water and effluent monitoring station?

Water analysis, ranges, installation point, sampling conditions, communications and reporting requirements. Integration with a state or corporate platform follows once its technical interface is confirmed.

3D

CEMS and AQMS stations in 3D

KNOWLEDGE BASE

Standards and guides

Need a calculation for this area?

An engineer replies with a selection and specification within one working day.