0%
INDUSTRIAL FILTRATION · 3D
PHOENIX PRIME
PROJECTS

Projects and engineering tasks

Two projects are published by name with the clients’ consent: CEMS stations at cement plants. The others are shown by scope of work, without unverified performance claims or commercially sensitive data.

OPERATING STATIONS

Continuous emission monitoring on cement plant stacks

Both stations are in operation: the flue-gas composition is measured continuously and the readings are transmitted online to EKO-NAZORAT, the monitoring system of the state environmental authority.

CEMS · Cement

Bekabadcement JSC

Bekabad

Measurement point
Stack No. 2 · Ø 4500 mm
Measured continuously
SO₂NONO₂COCO₂dustO₂flue-gas temperaturedifferential pressure

ONLINEReadings are transmitted online to EKO-NAZORAT

CEMS · Cement

Kyzylkumcement JSC

Navoi, Navoi region, Industrial Zone 3

Measurement point
Stack No. 4 · Ø 4000 mm
Measured continuously
SO₂NONO₂COCO₂dustO₂flue-gas temperaturedifferential pressure

ONLINEReadings are transmitted online to EKO-NAZORAT

SCOPE OF WORK

Other projects — by scope of work

01Dust collectionDust extraction upgrade

Hood and duct review, flow balancing, selection of filtration area, cleaning system and dust discharge.

  • System: baghouse
  • Stage: audit → EPC
02WastewaterOnline water quality monitoring

Measurement points, analysers, control cabinet, data archive and transfer interface.

  • Parameters: pH · EC · COD
  • Mode: online
NOTE

Card images illustrate the equipment type and are not presented as photographs of a specific client facility.

The names Bekabadcement JSC and Kyzylkumcement JSC are published with the clients’ consent. Other client names and exact results are disclosed only after agreement with the client.

SEE IT IN 3D

Project equipment in 3D

Need a similar project?

Send your process data and site constraints and we will define the calculation boundary and the next steps.